Flashing joints are lapped 6 in the direction of water flow.
Stucco counter flashing roof.
1 the flashing is depicted to be inserted into a horizontal reglet not sloped.
Weep screed for stucco 2020 detail.
Stucco roof flashing installation if you ll be working on the roof use roofing felt to cover the area where you ll be adding flashing.
And 4 the minimum 2 in.
Wall to roof deck flashing 2020 detail.
Then add a layer of asphalt cement to the area where you will attach the flashing.
Slip the wall leg of the weep screed behind the existing paper.
The flashing extends up the wall at least 4.
Overlap between the counterflashing and step flashing is not identified figure 9.
Cantilevered deck joist stucco 2020 detail.
Seal the indent with roofing caulking so the counter flashing hangs securely.
Use roofing cement to secure the counter flashing to the base flashing and the chimney.
3 the counterflashing terminates without a hemmed drip edge.
Control joint at floor line 2016 detail.
Sill pan for nail flange windows 2020 detail.
Be sure that it hangs so that it overlaps with the base flashing by at least 2 inches.
Check out our recommended tools right here.
The metal flashing is formed with a hook edge and cleated on 12 centers.
Kick out flashing for stucco 2019 detail.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
Roof first or stucco first.
Examples of roofs that can t be walked on are.
2 the counterflashing is depicted to be installed vertically in contact with the step flashing without a capillary break.
Be sure to overlap the old felt with the new felt by a foot and secure it with nails.
Slate spanish tile some copper roofs and aluminum roofs.
Lay 2x4 blocks on the roof to set a consistent height for the weep screed flashing.